Monday, October 29, 2012

Site Progress 26-10-2012

Site photos show the progress of site clearing for the next Phase 1 (114 units 3B/R). 









The remaining photos show that the entrance access from the expressway to the site, where the location of wash trough is to be identified.





More photos of completed site clearing for first portion of Phase 1.







  The remaining photos show the marshy mangrove and mobilization of the machine to the next phase 1.
















Sunday, October 14, 2012

Site Visit Photo 9-10-2012

Project signboard in front of site entrance

Thicker shrubs and bigger trees further

Further up site view
Front elevation from the road side

Boundary point at right hand side closed to Project sign board

Hard material encountered located approximately
at proposed main road (30m)

Completed site clearing at left hand side behind gas station downwards. Engineer’s at work               

Surface run off water track discovered towards marshy mangrove

Water path spotted within the marshy mangrove area

Water path with gentle water flow towards to the the main road
Part of hilly area within site

Undergrowth and shrubs within the site